ENGINEERING SOLUTIONS

Clint:

ExxonMobil

location:

Suez Terminal

Suez Terminal

It was to submit design with BOQ for the following with implementing ExxonMobil’s GPs:

1.Electro-mechanical works

2.Automation works

3.instrumentation works

4.Architectural design

Challenges

ExxonMobil needed to construct a new loading rack with utilizing largest number of equipment with zero shutoff time.

Contact Us

Full Name
Email
Phone
Whatsapp
Message

9 AbdAllah Deraz, from ElThawra St, Heliopolis, Cairo, Egypt

+202 22913195

+202 24158587

Info

Info@matrix-en.com