Clint:
ExxonMobil
location:
ExxonMobile
Installation of HLA system :for product level monitoring for ExxonMobil Mex Terminal, also testing and inspection in accordance with international standards and client specifications.
Project objective was to change the existing old level switches with vibrating forks and to upgrade the HLA system at the terminal including cables and panels.
9 AbdAllah Deraz, from ElThawra St, Heliopolis, Cairo, Egypt
+202 22913195
+202 24158587
Info
Info@matrix-en.com